Experience of Consultant Services
No |
Project |
Client |
Period |
Description |
||
01 |
FEED (Front End Engineering and Design ) Support |
|
NOV 2016 to |
Studies of laws, government application, climate conditions for FEED (Front End Engineering and Design) |
||
02 |
Nobeoka Power Plant |
|
JAN 2017 to |
Schedule control of steel structure fabrication ordered to a Thai fabricator by the client |
||
03 |
Bid support |
|
MAY 2017 to |
Studies for laws, vendor or construction prices necessary for biding of an EPC project. |
||
04 |
Raw study for waste incineration plant |
|
JAN 2018 to |
Studies for laws and construction equipment and materials applied for actual design. |
||
05 |
Bid support |
|
MAY 2018 to OCT 2018 |
Studies for laws and government applications necessary for the bidding of an EPC project |
||
06 |
Construction permission application to IEAT |
|
Nov 2018 to |
Application for construction permission to IEAT |
||
07 |
EPC support |
|
MAR 2019 to |
Studies for laws and regulations for EPC project execution, coordination for government application with the authorities. |
||
08 |
Translation of EIA |
|
MAR 2019 to |
Translation of EIA report mad by PTT from Thai to English. |
||
09 |
Raw study and interpretation for construction and factory operation |
|
APR 2019 to |
Studies of laws and regulations for the plant construction and operation. |
||
10 |
Completion inspection of bond warehouse |
|
MAY 2019 |
Completion inspection of bond warehouse on behalf of the client (a trading company) and preparation of a report. |
||
11 |
Translation of initial environmental report |
|
JUN 2019 to |
Translation of IEE (Initial Environmental Examination Report) from Thai to English |
||
12 |
Design of pressure vessel due to the change of applicable standard |
|
AUG 2019 to |
Conversion of pressure vessel and piping drawing made by the client from JIS to ASTM, ASME and ANSI |
||
13 |
Law study and interpretation for construction and factory operation, and support for actual implementation |
|
SEP 2019 to |
Study and interpretation of laws and regulations for plant construction and operation, and application to the actual work. |
||
14 |
Calculation of pressure vessels from JIS to ASME |
|
NOV 2019 to |
Preparation of calculation sheet for pressure vessels made by the client in accordance with JIS to ASME. |
||
15 |
Fatigue analysis of pressure vessels in gas production unit |
|
NOV 2019 to |
Fatigue analysis of pressure vessels in accordance with ASME Section VIII Division 2 |
||
16 |
Civil, electric and instrument design of a chemical plant, introduction of contractors, inquiry and evaluation |
|
MAR 2020 to |
Design introduction of contractors, inquiry, collection of proposal, checking of proposal and evaluation |
||
17 |
Construction site management in the chemical plant project |
|
FEB 2021 to |
Construction management at construction site, schedule control, coordination of the owner and control of subcontractors. |
||
18 |
FEED (Front End Engineering and Design ) Support |
|
FEB 2022 to |
Studies of laws, government application, for FEED (Front End Engineering and Design) |
||
19 |
Structural calculation of existing building by expansion of equipment in the building |
|
FEB 2022 |
Structural calculation of existing building in a chemical plant when equipment are added and evaluation of strength. |
||
20 |
Skid design of power plant |
|
FEB 2022 |
Design of skid (structural calculation and drawing preparation) used in a power plant. |
||
21 |
Construction permission application to the government |
|
APR 2022 to |
Application for construction permission to IEAT for chemical plant construction. |
||
22 |
Engineering support for FEED |
|
FEB 2022 to |
Law study and engineering support for FEED (Front End Engineering and Design). |
||
23 |
Engineering for new tank installation and project management services |
|
MAY 2024 to |
Engineering for tank installation and project management on behalf of the owner, coordination with the owner and contractors, schedule control and inspection work. |
||
24 |
Structural analysis of a damaged tank and recommendation for repair |
|
MAY 2024 to |
Cause analysis of damaged 24,000KL tank, structural analysis and recommendation for repair method. |
||
25 |
Selection of factory site recommendation and legal restrictions for building construction. |
|
JAN 2024 |
Support to select a factory site, and legal restrictions for building construction. |
||
26 |
Corrosion diagnosis of tank an piping, and calibration of instruments |
|
DEC 2024 to |
Corrosion diagnosis by measuring the thickness and calibration of instruments around tank |