Experience of Consultant Services
No | Project | Client | Period | Description | ||
01 | FEED (Front End Engineering and Design ) Support |
| NOV 2016 to | Studies of laws, government application, climate conditions for FEED (Front End Engineering and Design) | ||
02 | Nobeoka Power Plant |
| JAN 2017 to | Schedule control of steel structure fabrication ordered to a Thai fabricator by the client | ||
03 | Bid support |
| MAY 2017 to | Studies for laws, vendor or construction prices necessary for biding of an EPC project. | ||
04 | Raw study for waste incineration plant |
| JAN 2018 to | Studies for laws and construction equipment and materials applied for actual design. | ||
05 | Bid support |
| MAY 2018 to OCT 2018 | Studies for laws and government applications necessary for the bidding of an EPC project | ||
06 | Construction permission application to IEAT |
| Nov 2018 to | Application for construction permission to IEAT | ||
07 | EPC support |
| MAR 2019 to | Studies for laws and regulations for EPC project execution, coordination for government application with the authorities. | ||
08 | Translation of EIA |
| MAR 2019 to | Translation of EIA report mad by PTT from Thai to English. | ||
09 | Raw study and interpretation for construction and factory operation |
| APR 2019 to | Studies of laws and regulations for the plant construction and operation. | ||
10 | Completion inspection of bond warehouse |
| MAY 2019 | Completion inspection of bond warehouse on behalf of the client (a trading company) and preparation of a report. | ||
11 | Translation of initial environmental report |
| JUN 2019 to | Translation of IEE (Initial Environmental Examination Report) from Thai to English | ||
12 | Design of pressure vessel due to the change of applicable standard |
| AUG 2019 to | Conversion of pressure vessel and piping drawing made by the client from JIS to ASTM, ASME and ANSI | ||
13 | Law study and interpretation for construction and factory operation, and support for actual implementation |
| SEP 2019 to | Study and interpretation of laws and regulations for plant construction and operation, and application to the actual work. | ||
14 | Calculation of pressure vessels from JIS to ASME |
| NOV 2019 to | Preparation of calculation sheet for pressure vessels made by the client in accordance with JIS to ASME. | ||
15 | Fatigue analysis of pressure vessels in gas production unit |
| NOV 2019 to | Fatigue analysis of pressure vessels in accordance with ASME Section VIII Division 2 | ||
16 | Civil, electric and instrument design of a chemical plant, introduction of contractors, inquiry and evaluation |
| MAR 2020 to | Design introduction of contractors, inquiry, collection of proposal, checking of proposal and evaluation | ||
17 | Construction site management in the chemical plant project |
| FEB 2021 to | Construction management at construction site, schedule control, coordination of the owner and control of subcontractors. | ||
18 | FEED (Front End Engineering and Design ) Support |
| FEB 2022 to | Studies of laws, government application, for FEED (Front End Engineering and Design) | ||
19 | Structural calculation of existing building by expansion of equipment in the building |
| FEB 2022 | Structural calculation of existing building in a chemical plant when equipment are added and evaluation of strength. | ||
20 | Skid design of power plant |
| FEB 2022 | Design of skid (structural calculation and drawing preparation) used in a power plant. | ||
21 | Construction permission application to the government |
| APR 2022 to | Application for construction permission to IEAT for chemical plant construction. | ||
22 | Engineering support for FEED |
| FEB 2022 to | Law study and engineering support for FEED (Front End Engineering and Design). | ||
23 | Engineering for new tank installation and project management services |
| MAY 2024 to | Engineering for tank installation and project management on behalf of the owner, coordination with the owner and contractors, schedule control and inspection work. | ||
24 | Structural analysis of a damaged tank and recommendation for repair |
| MAY 2024 to | Cause analysis of damaged 24,000KL tank, structural analysis and recommendation for repair method. | ||
25 | Selection of factory site recommendation and legal restrictions for building construction. |
| JAN 2024 | Support to select a factory site, and legal restrictions for building construction. | ||
26 | Corrosion diagnosis of tank an piping, and calibration of instruments |
| DEC 2024 to | Corrosion diagnosis by measuring the thickness and calibration of instruments around tank |