Experience of Consultant Services

 

No

Project

Client

Period

Description

01

FEED (Front End Engineering and Design ) Support

J Company


Engineering

NOV 2016 to
APR 2017

Studies of laws, government application, climate conditions for FEED (Front End Engineering and Design)

02

Nobeoka Power Plant

M Company


Engineering

JAN 2017 to
MAY 2017

Schedule control of steel structure fabrication ordered to a Thai fabricator by the client

03

Bid support

J Company


Engineering

MAY 2017 to
FEB 2019

Studies for laws, vendor or construction prices necessary for biding of an EPC project.

04

Raw study for waste incineration plant

M Company


Engineering

JAN 2018 to
MAY 2018

Studies for laws and construction equipment and materials applied for actual design.

05

Bid support

T Company


Engineering

MAY 2018 to OCT 2018

Studies for laws and government applications necessary for the bidding of an EPC project

06

Construction permission application to IEAT

T Company


Engineering

Nov 2018 to
Dec 2018

Application for construction permission to IEAT

07

EPC support

J Company


Engineering

MAR 2019 to
(Ongoing)

Studies for laws and regulations for EPC project execution, coordination for government application with the authorities.

08

Translation of EIA

J Company


Engineering

MAR 2019 to
APR 2019

Translation of EIA report mad by PTT from Thai to English.

09

Raw study and interpretation for construction and factory operation

S Company


Chemical

APR 2019 to
MAY 2019

Studies of laws and regulations for the plant construction and operation.

10

Completion inspection of bond warehouse

S Company


Trading Co.

MAY 2019

Completion inspection of bond warehouse on behalf of the client (a trading company) and preparation of a report.

11

Translation of initial environmental report

J Company


Engineering

JUN 2019 to
AUG 2019

Translation of IEE (Initial Environmental Examination Report) from Thai to English

12

Design of pressure vessel due to the change of applicable standard

O Company


Gas

AUG 2019 to
MAR 2020

Conversion of pressure vessel and piping drawing made by the client from JIS to ASTM, ASME and ANSI

13

Law study and interpretation for construction and factory operation, and support for actual implementation

S Company


Chemical

SEP 2019 to
OCT 2019

Study and interpretation of laws and regulations for plant construction and operation, and application to the actual work.

14

Calculation of pressure vessels from JIS to ASME

O Company


Gas, Energy

NOV 2019 to
MAR 2020

Preparation of calculation sheet for pressure vessels made by the client in accordance with JIS to ASME.

15

Fatigue analysis of pressure vessels in gas production unit

O Company


Gas, Energy

NOV 2019 to
MAR 2020

Fatigue analysis of pressure vessels in accordance with ASME Section VIII Division 2

16

Civil, electric and instrument design of a chemical plant, introduction of contractors, inquiry and evaluation

M Company


Engineering

MAR 2020 to
APR 2020

Design introduction of contractors, inquiry, collection of proposal, checking of proposal and evaluation

17

Construction site management in the chemical plant project

M Company


Engineering

FEB 2021 to
APR 2021

Construction management at construction site, schedule control, coordination of the owner and control of subcontractors.

18

FEED (Front End Engineering and Design ) Support

J Company


Engineering

FEB 2022 to
FEB 2023

Studies of laws, government application, for FEED (Front End Engineering and Design)

19

Structural calculation of existing building by expansion of equipment in the building

T Company


Chemical

FEB 2022

Structural calculation of existing building in a chemical plant when equipment are added and evaluation of strength.

20

Skid design of power plant

T Company


Engineering

FEB 2022

Design of skid (structural calculation and drawing preparation) used in a power plant.

21

Construction permission application to the government

J Company


Engineering

APR 2022 to
SEP 2023

Application for construction permission to IEAT for chemical plant construction.

22

Engineering support for FEED

J Company


Engineering

FEB 2022 to
FEB 2023

Law study and engineering support for FEED (Front End Engineering and Design).

23

Engineering for new tank installation and project management services

T Company


Chemical

MAY 2024 to
DEC 2024

Engineering for tank installation and project management on behalf of the owner, coordination with the owner and contractors, schedule control and inspection work.

24

Structural analysis of a damaged tank and recommendation for repair

N Company


Power, Energy

MAY 2024 to
JUN 2024

Cause analysis of damaged 24,000KL tank, structural analysis and recommendation for repair method.

25

Selection of factory site recommendation and legal restrictions for building construction.

H Company


Chemical

JAN 2024

Support to select a factory site, and legal restrictions for building construction.

26

Corrosion diagnosis of tank an piping, and calibration of instruments

T Company


Electric Appliance

DEC 2024 to
JAN 2025

Corrosion diagnosis by measuring the thickness and calibration of instruments around tank

 